Videos
Play / Download VideoAD14/180723D/CY-C/F/
Shima SVR 112SV 7gg Knitting Machine
Year: 2015
Machine will be complete and Fully reconditioned.
Machine reconditioning process consists of the following:
- Complete dismantling of the machines
- Wash and clean the needle bed and all parts
- Check and replace defective parts
- Installing on the machine
a. NEW Groz Beckert needles
b. NEW Take Down Rollers
c. NEW Main Electrical Cables
d. NEW Belts
e. Parts and instruction manuals
Machines will be knit tested to make sure all functions are running properly and the machine is ready to work.
All reconditioned machines come with warranty on all electrical parts and electronic boards.
All parts used to recondition the machine are original factory parts (SHIMA SEIKI).