AB64/150125/BY/
Babcock Complete Tufting Backing and Finishing Line
Year: 1993
ww: 5,2 m
Gas heated.
1. UNROLL TROLLY
2. DOHLE SEWING MACHINE
3. J-BOX
4. PULL UNIT
5. MAHLO ANTI BOWING UNIT
6. BRUSH UNIT
7. LICKROLLER (précoat)
8.1. SECONDARY BACKING UNIIT unroller
8.2. J-box
8.3. pull-unit
9. ENTRY FIRST OVEN
10. FIRST OVEN 6 chambers, split
11. MITTER FOAM APPLICATOR for chemicals
12. FOAM TABLE for latex
13. ENTRY MAIN OVEN
14. MAIN OVEN 16 chambers, split
15. COOLING ZONE
16. SIDE CUTTERS
17. MATTHYS ACCUMULATOR 1
18. INSPECTION ZONE
19. MATTHYS ACCUMULATOR 2
20.1. HANDSEAME PACKING UNIT plastic feeder
20.2. carton pipe feeder
20.3. automatic packing unit
20.4. roll-up winder
20.5. packing winder
20.6. transportation belt
21. HEAT RECYCLING SYSTEM
30. CAMPEN FOAM MIXER (on request)
31. MAHLO ANTI BOWING UNIT ORTHOPAC automatic (on request)
32. LATEX KITCHEN 2 x stainless steel tanks + 3 pumps (on request)
NOTES:
Line comes without items 30, 31, 32 (see list of items)
Speed is between 7 & 18 m/min, depending on quality
Line can do grass, but PERFORATOR has to be added to make holes
Disùmantling, packing & loading cost is approx Eur 80,000
Ctrs requirement for shipping is approx 24 x 40FTHC