AB64/200625/AO/
High Quality Babcock Tufting Complete Finishing Line
ETF part 1996
Babcock part 1998
Küsters part 1998
Documentation of line available (Babcock / ETF)
Auto cross lapper Matthys (2014) :
J-box
Wash installation Küsters (incl Robushi pumps)
Centering frame
Drying zone Babcock (after wash installation) 10 fields
Mahlo measurement of weight applicated compound
Precoat applicator (fixation of tufted piles)
Drying zone Babcock after precoat application 18 fields
Babcock main control panel
Foamtable / application glue for secondary backing
Unwinding secondary backing
Kashier installation for gluing secondary backing to carpet
Drying zone Babcock after foam application 20 fields
Cooling zone
Cutting edges
Compensator before inspection table
Inspection table
Centering frame
Compensator (fix an d variable) before cutting and winding ETF
Centering frame
Cutting / winding / packaging ETF