
AB55/150924D/ACL-AI/F/AR/
Ferraro Open Width Compactor
Quantity: 1
Year: 2018, Installed Year 2019
Only ran 6 months.
2500 mm.
Long Vertical Chain with integrated Inspection and rolling.
Tension Bar Entry to Lattice Roll Guider to Operators
Platform to Open Tenter 33FT long w/knit entry E & L Plate Guiders
Overfeed
Pinning Brushes
Rail Guiders
Vertical Pin Chain
Steamer to Compacting
Bench Hot Oil Heated (Electric ally Heated) to Fabric Conveyor to Flat Folder and lnline Inspection Batcher w/Edge Guiding.